By Terence Tang, founder and general manager of CDRD, a China–Europe rail freight forwarder.

Quick answer: Chengdu to Małaszewicze runs 16.8 days station to station on our latest 10 trains (15–19 days), against an 18.7-day average across all 214 trains we have recorded. Chengdu to Łódź averages 21.9 days on the latest 10. Poland sits at the point where every China–Europe train changes gauge, which is why Polish importers see the shortest rail transit times in the EU.

All figures come from CDRD shipment records — 274 trains on Poland lanes, updated daily on our live transit-time page.

The numbers

Lane Trains recorded Average Fastest Latest 10 trains
Chengdu → Małaszewicze21418.7 days12 days16.8 days avg (15–19)
Chengdu → Łódź3822.6 days14 days21.9 days avg (17–29)
Łódź → Chengdu (eastbound)2219.6 days16 days17.9 days avg (16–20)

Station to station, calendar days, departure to arrival. Door-to-door adds origin pickup, customs and final delivery — typically several days at each end.

The Łódź sample is much smaller than Małaszewicze for a structural reason: westbound slots to Łódź are limited, and most Poland-bound cargo does not need them. Once a train reaches Małaszewicze the cargo is already inside the EU, so continuing by truck from there is usually faster and more flexible than staying on the rails for another few days. Our own LCL service works exactly that way.

Why Poland gets cargo first

This is the part most importers outside the industry never hear.

China uses 1435 mm standard gauge. Kazakhstan, Russia and Belarus use 1520 mm broad gauge. The EU is back to 1435 mm. Every westbound train therefore has to change gauge twice, and the second change happens at Małaszewicze, on the Belarus–Poland border — the largest dry port on the corridor and the entry point into the EU for the overwhelming majority of China–Europe trains.

A container destined for Duisburg, Rotterdam or Milan passes through Małaszewicze and then continues by rail or truck across Europe. A container destined for Poland is already there.

The gap is visible in our own data:

  • Chengdu → Małaszewicze, latest 10 trains: 16.8 days
  • Chengdu → Duisburg, latest 10 trains: 19.4 days

Roughly three days, on the same trains, on the same corridor. For Polish importers that is a structural advantage, not a service level anyone is selling them.

Małaszewicze in practice

The border transload is currently running 1–2 days — faster than in previous years, when queues of a week or more were common in peak season. Containers are either lifted onto European-gauge wagons or the goods are transloaded into new units, depending on the service.

This is also the single most common point of failure on the corridor. Delays here are rarely about the rails; they are about wagon allocation, paperwork sequencing and whether anyone is physically on the ground when something goes wrong at 4pm Polish time.

The transload itself is performed by the terminal operators at the border. What we contribute is a Polish company, TLGP sp. z o.o., working in the same time zone as the terminal: chasing wagon allocation, handling customs formalities and arranging onward delivery, rather than relaying messages back through China. Many Chinese forwarders quoting this lane have no legal entity in Poland at all — when a container stops moving at the border, their only option is to call their upstream operator and wait.

Rail into Poland versus ocean

Polish importers have two realistic options for Chinese cargo, and the comparison is more lopsided than for Germany or the Netherlands.

Ocean means Gdańsk or Gdynia — or, frequently, Rotterdam or Hamburg with onward trucking. Shanghai to North European ports currently runs 45–50 days port to port, because most carriers are routing around the Cape of Good Hope instead of the Suez Canal after the Red Sea disruption. Add inland trucking and terminal release and the realistic door-to-door figure is above 50 days.

Rail into Małaszewicze is 16–19 days station to station on current performance.

That is a gap of roughly a month. It does not make rail the right answer for every shipment — bulk, low-value and deadline-free cargo still belongs on a ship — but for anything with a production schedule attached, the arithmetic on this lane is not close.

LCL to Poland

Weekly consolidations mean a shipment of a few cubic metres departs on the next scheduled train instead of waiting for a full container to fill. Compared with ocean groupage, where the consolidation cycle alone can add two to three weeks before the vessel sails, the practical difference for small cargo is larger than the headline transit numbers suggest.

Our Poland LCL containers come off the train at Małaszewicze, move to Warsaw by truck, and are unpacked there. From Warsaw the individual consignments go out by truck across Poland and to nearby EU destinations.

We run several unpacking points across Europe and route each shipment to the nearest one: Warsaw for Poland and its neighbours, Duisburg for cargo further west, Milan for the south, Budapest for Central Europe. Choosing the closest hub keeps the final trucking leg — and its cost — down.

Eastbound: Poland to China

Real transit data for the return leg is almost impossible to find online, so here is ours: Łódź → Chengdu, 22 trains recorded, 19.6-day average, 16 days fastest, latest 10 trains averaging 17.9 days.

Eastbound volumes on the corridor are a fraction of westbound, which means space is generally available but departures are less frequent than in the other direction.

Frequently asked questions

How long does rail freight take from China to Poland?
16.8 days station to station on the latest 10 Chengdu–Małaszewicze trains, range 15–19 days, based on CDRD records. The average across all 214 recorded trains on that lane is 18.7 days, fastest 12 days.

How long does it take from China to Warsaw or Łódź?
Chengdu to Łódź averages 21.9 days on the latest 10 trains, 22.6 days across all 38 recorded. For Warsaw and most other Polish destinations, cargo normally leaves the train at Małaszewicze and continues by truck, which is usually faster than staying on rail to Łódź.

Why is rail to Poland faster than rail to Germany?
Because Małaszewicze, on the Belarus–Poland border, is where trains change gauge and enter the EU. Cargo bound for Germany or further west continues from there. Our data shows roughly a three-day difference between Małaszewicze and Duisburg on recent trains.

How long does the Małaszewicze border transload take?
Currently 1–2 days, faster than in previous seasons. It remains the most common source of variation in total transit time.

Is rail cheaper than ocean freight to Poland?
No — ocean is still cheaper per container. Rail is faster: roughly 16–19 days station to station versus more than 50 days door to door by sea on current Cape of Good Hope routings. The choice depends on whether the time is worth more to you than the freight difference.

Can I ship less than a full container to Poland by rail?
Yes. Weekly LCL consolidations run from major Chinese origins. The container leaves the train at Małaszewicze, is trucked to Warsaw and unpacked there, and individual consignments then go out by truck across Poland and nearby EU destinations. There is no minimum container requirement.

Do you handle export from Poland to China?
Yes. Łódź → Chengdu averages 19.6 days across 22 recorded trains, 17.9 days on the latest 10. Eastbound departures are less frequent than westbound, so booking earlier matters more on this direction.

Where does this data come from?
Every figure is a real CDRD-handled train with its actual departure and arrival dates. The underlying dataset is regenerated daily and published on our transit-time page. It is not a carrier schedule or a marketing estimate.

Related reading

Chengdu Reindeer International Logistics Co., Ltd. (CDRD) is a specialist China–Europe rail freight forwarder based in Chengdu, China, with a Polish company, TLGP sp. z o.o., covering the Małaszewicze border crossing and onward delivery in Europe. For a quote on the China–Poland lane, contact opx@railway-eu.com or use our quote form.


中国到波兰铁路运输 2026:274 班车的真实时效数据

作者:唐 (Terence Tang),CDRD 创始人兼总经理,长期从事中欧班列货运代理业务。

核心结论: 成都到马拉舍维奇,最近 10 班平均 16.8 天站到站(15–19 天),全部 214 班的平均值是 18.7 天。成都到罗兹最近 10 班平均 21.9 天。波兰正好位于所有中欧班列换装的位置,这也是波兰进口商能拿到全欧盟最短铁路时效的原因。

数据来自 CDRD 运单记录——波兰方向 274 班车,每日自动更新于实时时效页

数据

线路 记录班次 平均 最快 最近 10 班
成都 → 马拉舍维奇21418.7 天12 天16.8 天(15–19)
成都 → 罗兹3822.6 天14 天21.9 天(17–29)
罗兹 → 成都(回程)2219.6 天16 天17.9 天(16–20)

站到站、自然日、发车到到达。门到门还需加上起运地提货、清关和目的地派送,两端通常各数天。

罗兹的样本量远小于马拉舍维奇,原因是结构性的:西行到罗兹的舱位本来就少,而且大部分发往波兰的货物并不需要走到罗兹。列车抵达马拉舍维奇时货物已经进入欧盟,从这里改公路通常比继续在铁路上多耗几天更快、也更灵活。我们自己的拼箱服务走的就是这个模式。

为什么波兰最先拿到货

这一点行业外的进口商很少听说。

中国用 1435 毫米标准轨,哈萨克斯坦、俄罗斯、白俄罗斯用 1520 毫米宽轨,进入欧盟又回到 1435 毫米。所以每一列西行班列都要换装两次,第二次就在白俄罗斯与波兰边境的马拉舍维奇——这条走廊上最大的陆港,也是绝大多数中欧班列进入欧盟的入口。

发往杜伊斯堡、鹿特丹或米兰的箱子,都要经过马拉舍维奇,再继续走铁路或公路穿越欧洲。而发往波兰的箱子,到这里就已经到了。

差距在我们自己的数据里看得很清楚:

  • 成都 → 马拉舍维奇,最近 10 班:16.8 天
  • 成都 → 杜伊斯堡,最近 10 班:19.4 天

同一条走廊、同一批列车,相差约三天。对波兰进口商来说这是结构性优势,而且没有人把它当卖点讲给他们听。

马拉舍维奇的实际操作

口岸换装目前是 1–2 天,比往年快——过去旺季排队一周以上并不少见。视服务方式不同,或者把箱子吊装到欧洲轨距的车板上,或者把货物换装到新的箱体。

这里也是全程最容易出问题的一环。延误很少是铁路本身的问题,而是车板分配、单证流转的先后顺序,以及波兰时间下午四点出状况时现场有没有人。

换装作业本身由口岸企业执行。我们能提供的是一家波兰公司 TLGP sp. z o.o.,与口岸在同一时区办公:盯车板分配、处理清关手续、安排后续派送,而不是把消息转回国内再等回复。很多报这条线的中国货代在波兰没有自己的法人实体,箱子在口岸卡住时,唯一能做的就是打电话给上家然后等。

波兰线:铁路 vs 海运

波兰进口商从中国进货,实际只有两个选择,而且这个对比比德国、荷兰更悬殊。

海运走格但斯克或格丁尼亚,也经常走鹿特丹、汉堡再卡车转运。上海到北欧基本港目前港到港 45–50 天——红海事件后大部分船公司绕行好望角而非苏伊士运河。再加上内陆卡车和目的港放箱,实际门到门超过 50 天。

铁路到马拉舍维奇,按当前表现是 16–19 天站到站。

差距约一个月。这不代表所有货都该走铁路——大宗、低货值、没有交期压力的货仍然属于海运——但只要货物挂着生产排期,这条线上的账根本不用算。

波兰拼箱

每周固定拼箱,意味着几个立方的货可以直接上最近一班列车,不必等柜子装满。而海运拼箱光集货周期就可能再加两到三周,所以对小货来说,实际时间差比表面数字还要大。

我们发往波兰的拼箱柜在马拉舍维奇下火车,公路运到华沙掏箱,之后各票货再由卡车派送至波兰全境及周边欧盟城市。

我们在欧洲设有多个掏箱点,每票货按就近原则安排:波兰及周边走华沙,更靠西走杜伊斯堡,南欧走米兰,中欧走布达佩斯。选最近的掏箱点,最后一段卡车距离和费用都能压下来。

回程:波兰到中国

回程的真实时效数据网上几乎找不到,这里给出我们的:罗兹 → 成都,记录 22 班,平均 19.6 天,最快 16 天,最近 10 班平均 17.9 天。

这条走廊的回程货量只有去程的一小部分,所以舱位一般都有,但班次比去程少。

常见问题

中国到波兰铁路运输要多久?
成都—马拉舍维奇最近 10 班平均 16.8 天站到站,区间 15–19 天(数据来源:CDRD 运单记录)。该线路全部 214 班的平均值为 18.7 天,最快 12 天。

到华沙、罗兹要多久?
成都到罗兹最近 10 班平均 21.9 天,全部 38 班平均 22.6 天。发往华沙及波兰大部分城市的货物,通常在马拉舍维奇下火车转公路,比继续走铁路到罗兹更快。

为什么到波兰比到德国快?
因为白波边境的马拉舍维奇正是列车换装、进入欧盟的地方。发往德国及更西边的货物要从这里继续运输。我们的数据显示,近期班列中马拉舍维奇比杜伊斯堡快约三天。

马拉舍维奇换装要几天?
目前 1–2 天,比往年更快。它仍是全程时效波动的主要来源。

到波兰,铁路比海运便宜吗?
不便宜——按柜计算海运仍然更低。铁路的优势是快:16–19 天站到站,对比当前绕行好望角情况下海运门到门 50 天以上。取舍在于这一个月的时间对你值不值这个差价。

不够整柜可以走铁路到波兰吗?
可以。主要起运城市每周有拼箱班列。柜子在马拉舍维奇下火车,公路运到华沙掏箱,之后各票货由卡车派送波兰全境及周边欧盟城市,没有整柜起运门槛。

做波兰到中国的出口吗?
做。罗兹—成都记录 22 班,平均 19.6 天,最近 10 班 17.9 天。回程班次比去程少,所以这个方向更需要提前订舱。

这些数据从哪来?
每一条都是 CDRD 实际操作、真实发车和到达日期的班列。底层数据每日自动更新,公开发布在时效数据页。不是船期表,也不是营销估算。

延伸阅读

成都瑞源欧达国际物流有限责任公司(CDRD)是专注中欧班列的货运代理,总部位于中国成都,并设有波兰公司 TLGP sp. z o.o.,负责马拉舍维奇口岸及欧洲段的落地服务。波兰线路询价请联系 opx@railway-eu.com,或使用报价表单

Need a quote for China–Europe rail freight?
FCL and LCL, weekly departures, door-to-door. Reply within 12 hours.
Request a quote   or email opx@railway-eu.com